Client:
Symal / Barwon Water
Description:
Barwon Water was required to protect and provide safety upgrades to Colac’s water supply, Symal engaged Bridgecon to carry out embankment and concrete spillway works. The works involved significant safety upgrades to the existing reservoir, including the upgrade of the existing weighting berm and new concrete spillway.
Works involved:
-Formwork, Reinforcement and Concrete of the base slab, walls and spoon drain.
Project value: <$1m