Effective Earthwork Planning and Design for Infrastructure Development Projects
09 February 2023Construction projects involving infrastructure building sometimes include extensive amounts of earthwork, which accounts for a significant portion of the overall cost. Therefore, it needs to be carefully planned and designed, considering the necessity of reducing the amount of waste produced, reusing and recycling the materials excavated, striking a balance between cutting and filling, plant operations, soil testing, soil modifications or stabilisation, and other similar considerations.
Main Purpose of Earthwork
The earthworks team’s primary objective should be to produce a design for the earthworks that is realisable, practical, attainable, and appropriate for the intended application. It is important to consider the land needs, including any temporary works. During the building phase and for any future maintenance activities, the design should be established to have the least influence on the surrounding environment possible.
The Importance of Conducting Ground Investigation
The site research, which may include a desk study, geo-morphological mapping, topographic survey, and physical ground investigation (GI), needs to be prepared and carried out to guarantee that the site characteristics are comprehended adequately. In particular, it is crucial that the GI gives comprehensive and sufficient information for designs and construction and research of existing earthworks and slopes.
Detailed Design According to Ground Investigation Results
It is recommended that the detailed design be carried out based on the GI data that has been acquired. The report on the geotechnical design explains how the GI data were interpreted and included in the design. It also explains the design values selected for the rock and soil qualities.
As With Some Materials and Other Considerations
When earthwork solutions involve artificial materials, such as gabions, geo-synthetics, soil nails, embedded piles, or structures as part of the earthwork solutions, the situation shifts in a different direction. When it comes to these integrated types of earthwork, the structural element can be constructed to represent the durability of engineering elements by having its life modelled by the design of the element itself.
In the same way, as stability issues are time-dependent, so too are the impacts of deformations. It may take several years before the full effects of deformations become apparent. In most cases, it will be discovered that the crucial issue is the serviceability limit condition of the structure that is supported by earthworks or influenced by them rather than that of the earthworks themselves.
Certain materials, such as silty sands, silty clays, and chalks, have a critical level of moisture content that, when exceeded, causes them to become unsuitable for the typical methods of earthwork building rapidly. This level may be determined by testing the material.
For all varieties of soil that primarily display cohesive qualities, a laboratory investigation of the link between the soil’s moisture content, density, and undrained shear strength or CBR values has to be carried out. When choosing design parameters, one ought to consider the grading of the soil and the nature of the good content in fine-grained soils. This is because soil plasticity is often understood to be synonymous with the term “plasticity.”
Learn more about this technology with your experts here at BridgeCon.